Fulton Maintenance after completion ordinance (§ 98-66)

Chapter 98: Streets, Sidewalks and Other Public Places · Article III. Excavations

In short: Anyone with a street excavation permit must maintain the trench and disturbed pavement for six months after completion and make repairs within ten days of notice from the city engineer.

Our plain-English summary, not the official text or legal advice. The ordinance below is what counts.

Every applicant for a permit under this article will be required to maintain the trench and such pavements as are disturbed through the installation of fixtures for a period of six months from the date of completion, during which period such applicant shall make all necessary repairs within ten days after being notified by the city engineer.

Official source: City of Fulton official Code of Ordinances (online): look up Sec. 98-66

Last checked October 30, 2026. The city's official copy controls; this page is a reading copy, not legal advice.