New Franklin Ordinance 805: Floodplain management
Passed 2022.
The city posts this as its floodplain management ordinance; the file is the state's model ordinance, updated June 2022. Compare Chapter 415 of the code book.
Text read by machine from the city's scanned copy, so a few words may be misread; the PDF is the official copy.
MODEL FLOODPLAIN MANAGEMENT ORDINANCE
60.3(d)
FEMA has provided a FIRM with base flood elevations and designated floodway
The following model ordinance pertains only to the Special Flood Hazard Areas (SFHAs) in a
community that participates in the Regular Program Phase of the National Flood Insurance Program
(rather than the Emergency Program Phase). It has been designed to meet minimum Federal
requirements as published in Missouri Executive Order 98-03.
Not all sections in this model ordinance may be applicable to a community that wishes to adopt a
floodplain management ordinance. Before adoption, this model ordinance should be thoroughly
studied by community officials, planning commissions, and the community's attorney, as to its
adequacy and suitability to the community's needs. This will ensure that the community's specific
floodplain management issues are governed in a reasonable manner without inflicting unnecessary
hardships on people living in flood-prone areas.
This model does not prohibit development in the special flood hazard areas. It does set forth minimum
performance standards for new construction or substantially improved structures. Communities may
apply stricter regulations than the minimum requirements. For assistance in tailoring this ordinance to
meet your community's specific needs, a Floodplain Management specialist at the Missouri State
Emergency Management Agency (MoSEMA) may be contacted at the following address:
Missouri State Emergency Management Agency
Floodplain Management Section
2302 Militia Drive
Jefferson City, Missouri 65101
FLOODPLAIN MANAGEMENT ORDINANCE
Pursuant to 44 CFR § 60.3(d)
Bill No._11-14-2022.
Ordinance No. 805
ARTICLE 1 STATUTORY AUTHORIZATION, FINDINGS OF FACT, AND PURPOSES
SECTION A. STATUTORY AUTHORIZATION
The Legislature of the State of Missouri has in RSMo 79.110 delegated the responsibility to local
governmental units to adopt floodplain management regulations designed to protect the health, safety,
and general welfare of the public. Therefore, the Board of Aldermen of the City of New Franklin,
Missouri, ordains as follows:
SECTION B. FINDINGS OF FACT
Flood Losses Resulting from Periodic Inundation
The special flood hazard areas of New Franklin, Missouri, are subject to inundation, which
results in loss of life and property, health and safety hazards, disruption of commerce and
governmental services, extraordinary public expenditures for flood protection and relief, and
impairment of the tax base; all of which adversely affect the public health, safety and general
welfare.
General Causes of the Flood Losses
These flood losses are caused by (1) the cumulative effect of development in any delineated
floodplain causing increases in flood heights and velocities; and (2) the occupancy of flood
hazard areas by uses vulnerable to floods, hazardous to others, inadequately elevated, or
otherwise unprotected from flood damages.
3. Methods Used To Analyze Flood Hazards
The Flood Insurance Study (FIS) that is the basis of this ordinance uses a standard engineering
method of analyzing flood hazards, which consist of a series of interrelated steps.
a. Selection of a base flood that is based upon engineering calculations, which permit a
consideration of such flood factors as its expected frequency of occurrence, the area
inundated, and the depth of inundation. The base flood selected for this ordinance is
representative of large floods, which are characteristic of what can be expected to occur
on the particular streams subject to this ordinance. The base flood is the flood that is
estimated to have a one percent chance of being equaled or exceeded in any given year as
delineated on the Federal Insurance Administrator's FIS, and illustrative materials for
Howard County, dated March 21, 2017, as amended, and any future revisions thereto.
SEMA Model ORD
Page 1
Updated June 2022
b. Calculation of water surface profiles are based on a standard hydraulic engineering
analysis of the capacity of the stream channel and overbank areas to convey the
regulatory flood.
4. Computation of a floodway required to convey this flood without increasing flood heights more
than one (1) foot at any point.
Delineation of floodway encroachment lines within which no development is permitted that
would cause any increase in flood height.
6. Delineation of flood fringe, i.e., that area outside the floodway encroachment lines, but still
subject to inundation by the base flood.
SECTION C. STATEMENT OF PURPOSE
It is the purpose of this ordinance to promote the public health, safety, and general welfare of the public;
to minimize those losses described in Article 1, Section B (1); to establish or maintain the community's
eligibility for participation in the National Flood Insurance Program (NFIP) as defined in 44 Code of
Federal Regulations (CFR) § 59.22(a) (3); and to meet the requirements of 44 CFR § 60.3(d) by
applying the provisions of this ordinance to:
Restrict or prohibit uses that are dangerous to health, safety, or property in times of flooding or
cause undue increases in flood heights or velocities;
2. Require uses vulnerable to floods, including public facilities that serve such uses, be provided
with flood protection at the time of initial construction; and
3. Protect individuals from buying lands that are unsuited for the intended development purposes
due to the flood hazard.
ARTICLE 2 GENERAL PROVISIONS
SECTION A. LANDS TO WHICH ORDINANCE APPLIES
This ordinance shall apply to all lands within the jurisdiction of the City of New Franklin, Missouri,
identified as numbered and unnumbered A zones and AE zones, on the Flood Insurance Rate Map
(FIRM) panel numbers 29089C0269E and 29089C0288E dated March 21, 2017, as amended, and any
future revisions thereto. In all areas covered by this ordinance, no development shall be permitted except
through the issuance of a floodplain development permit, granted by the Board of Aldermen or its duly
designated representative under such safeguards and restrictions as the Board of Aldermen or the
designated representative may reasonably impose for the promotion and maintenance of the general
welfare, health of the inhabitants of the community, and as specifically noted in Article 4.
SEMA Model ORD
Page 2
Updated June 2022
SECTION B. COMPLIANCE
No development located within the special flood hazard areas of this community shall be located,
extended, converted, or structurally altered without full compliance with the terms of this ordinance and
other applicable regulations.
SECTION C. ABROGATION AND GREATER RESTRICTIONS
It is not intended by this ordinance to repeal, abrogate, or impair any existing easements, covenants, or
deed restrictions. However, where this ordinance imposes greater restrictions, the provisions of this
ordinance shall prevail. All other ordinances inconsistent with this ordinance are hereby repealed to the
extent of the inconsistency only.
SECTION D. INTERPRETATION
In their interpretation and application, the provisions of this ordinance shall be held to be minimum
requirements, shall be liberally construed in favor of the governing body, and shall not be deemed a
limitation or repeal of any other powers granted by Missouri statutes.
SECTION E. WARNING AND DISCLAIMER OF LIABILITY
The degree of flood protection required by this ordinance is considered reasonable for regulatory
purposes and is based on engineering and scientific methods of study. Larger floods may occur on rare
occasions or the flood heights may be increased by man-made or natural causes, such as ice jams and
bridge openings restricted by debris. This ordinance does not imply that areas outside the floodway and
flood fringe or land uses permitted within such areas will be free from flooding or flood damage. This
ordinance shall not create a liability on the part of the City of New Franklin, any officer or employee
thereof,
for any flood damages that may result from reliance on this ordinance or any administrative
decision lawfully made thereunder.
SECTION F. SEVERABILITY
If any section, clause, provision, or portion of this ordinance is adjudged unconstitutional or invalid by a
court of appropriate jurisdiction, the remainder of this ordinance shall not be affected thereby.
ARTICLE 3 ADMINISTRATION
SECTION A. FLOODPLAIN DEVELOPMENT PERMIT
A floodplain development permit shall be required for all proposed construction or other development,
including the placement of manufactured homes, in the areas described in Article 2, Section A. No
person, firm, corporation, or unit of government shall initiate any development or substantial-
improvement or cause the same to be done without first obtaining a separate floodplain development
permit for each structure or other development.
SEMA Model ORD
Page 3
Updated June 2022
SECTION B. DESIGNATION OF FLOODPLAIN ADMINISTRATOR
The Mayor is hereby appointed to administer and implement the provisions of this ordinance.
SECTION C. DUTIES AND RESPONSIBILITIES OF FLOODPLAIN ADMINISTRATOR
Duties of the floodplain administrator shall include, but not be limited to:
1. Review of all applications for floodplain development permits to assure that sites are reasonably
safe from flooding and that the floodplain development permit requirements of this ordinance
have been satisfied;
2. Review of all applications for floodplain development permits for proposed development to
assure that all necessary permits have been obtained from Federal, State, or local governmental
agencies from which prior approval is required by Federal, State, or local law;
3. Review all subdivision proposals and other proposed new development, including manufactured
home parks or subdivisions, to determine whether such proposals will be reasonably safe from
flooding;
4. Issue floodplain development permits for all approved applications;
5. Notify adjacent communities and the Missouri State Emergency Management Agency
(MoSEMA) prior to any alteration or relocation of a watercourse, and submit evidence of such
notification to the Federal Emergency Management Agency (FEMA);
6. Assure that the flood carrying capacity is not diminished and shall be maintained within the
altered or relocated portion of any watercourse.
7. Verify and maintain a record of the actual elevation (in relation to mean sea level) of the lowest
floor, including basement, of all new or substantially improved structures;
8. Verify and maintain a record of the actual elevation (in relation to mean sea level) that the new
or substantially improved non-residential structures have been floodproofed;
9. When floodproofing techniques are utilized for a particular non-residential structure, the
floodplain administrator shall require certification from a Missouri registered professional
engineer or architect.
SECTION D. APPLICATION FOR FLOODPLAIN DEVELOPMENT PERMIT
To obtain a floodplain development permit, the applicant shall first file an application in writing on a
form furnished for that purpose. Every floodplain development permit application shall:
SEMA Model ORD
Page 4
Updated June 2022
1. Describe the land on which the proposed work is to be done by lot, block and tract, house and
street address, or similar description that will readily identify and specifically locate the proposed
structure or work;
Identify and describe the work to be covered by the floodplain development permit;
3. Indicate the use or occupancy for which the proposed work is intended;
4. Indicate the fair market value of the structure and the fair market value of the improvement;
Specify whether development is located in designated flood fringe or floodway;
6. Identify the existing base flood elevation and the elevation of the proposed development;
7. Give such other information as reasonably may be required by the floodplain administrator;
8. Be accompanied by plans and specifications for proposed construction; and
9. Be signed by the permittee or his authorized agent who may be required to submit evidence to
indicate such authority.
ARTICLE 4 PROVISIONS FOR FLOOD HAZARD REDUCTION
SECTION A. GENERAL STANDARDS
1. No permit for floodplain development shall be granted for new construction, substantial-
improvements, and other improvements, including the placement of manufactured homes, within
any numbered or unnumbered A zones and AE zones, unless the conditions of this section are
satisfied.
ri
All areas identified as unnumbered A zones on the FIRM are subject to inundation of the one
percent annual chance (aka 100-year) flood; however, the base flood elevation is not provided.
Development within unnumbered A zones is subject to all provisions of this ordinance. If Flood
Insurance Study data is not available, the community shall obtain, review, and reasonably utilize
any base flood elevation or floodway data currently available from Federal, State, or other
sources.
Until a floodway is designated, no new construction, substantial improvements, or other
development, including fill, shall be permitted within any numbered A zones or AE zones on the
community's FIRM, unless it is demonstrated that the cumulative effect of the proposed
development, when combined with all other existing and anticipated development, will not
increase the water surface elevation of the base flood more than one foot at any point within the
community.
4. All new construction, subdivision proposals, substantial-improvements, prefabricated structures,
placement of manufactured homes, and other developments shall require:
SEMA Model ORD
Page 5
Updated June 2022
Design or adequate anchorage to prevent flotation, collapse, or lateral movement of the
structure resulting from hydrodynamic and hydrostatic loads, including the effects of
buoyancy;
b. Construction with materials resistant to flood damage;
c. Utilization of methods and practices that minimize flood damages;
d. All electrical, heating, ventilation, plumbing, air-conditioning equipment, and other
service facilities be designed and/or located so as to prevent water from entering or
accumulating within the components during conditions of flooding;
New or replacement water supply systems and/or sanitary sewage systems be designed to
minimize or eliminate infiltration of flood waters into the systems and discharges from
the systems into flood waters, and on-site waste disposal systems be located so as to
avoid impairment or contamination; and
f. Subdivision proposals and other proposed new development, including manufactured
home parks or subdivisions, located within special flood hazard areas are required to
assure that:
(1) All such proposals are consistent with the need to minimize flood damage;
(2) All public utilities and facilities, such as sewer, gas, electrical, and water systems
are located and constructed to minimize or eliminate flood damage;
(3) Adequate drainage is provided so as to reduce exposure to flood hazards; and
(4) All proposals for development, including proposals for manufactured home parks
and subdivisions, greater than fifty (50) lots or five (5) acres, whichever is lesser,
include within such proposals base flood elevation data.
5. Storage, material, and equipment
a. The storage or processing of materials within the special flood hazard area that are in
time of flooding buoyant, flammable, explosive, or could be injurious to human, animal,
or plant life is prohibited.
b. Storage of other material or equipment may be allowed if not subject to major damage by
floods, if firmly anchored to prevent flotation or if readily removable from the area
within the time available after a flood warning.
6. Nonconforming Use
A structure, or the use of a structure or premises that was lawful before the passage or
amendment of the ordinance, but which is not in conformity with the provisions of this
ordinance, may be continued subject to the following conditions:
a. If such structure, use, or utility service is discontinued for twelve (12)_consecutive
months, any future use of the building shall conform to this ordinance.
SEMA Model ORD
Page 6
Updated June 2022
b. If any nonconforming use or structure is destroyed by any means, including flood, it shall
not be reconstructed if the cost is more than 50 percent of the pre-damaged market value
of the structure. This limitation does not include the cost of any alteration to comply with
existing state or local health, sanitary, building, safety codes, regulations or the cost of
any alteration of a structure listed on the National Register of Historic Places, the State
Inventory of Historic Places, or local inventory of historic places upon determination.
7. Accessory Structures
Structures used solely for parking and limited storage purposes, not attached to any other
structure on the site, of limited investment value, and not larger than 400 square feet, may be
constructed at-grade and wet-floodproofed provided there is no human habitation or occupancy
of the structure; the structure is of single-wall design; the accessory structure meets the following
floodplain management requirements; and a floodplain development permit has been issued.
Wet-floodproofing is only allowed for small low-cost structures.
8. Hazardous Materials
All hazardous material storage and handling sites shall be located out of the special flood hazard area.
9. Agricultural Structures
Structures used solely for agricultural purposes in connection with the production, harvesting,
storage, drying, or raising of agricultural commodities, including the raising of livestock, may be
constructed at-grade and wet-floodproofed provided there is no human habitation or occupancy
of the structure; the structure is of single-wall design; there is no permanent retail, wholesale, or
manufacturing use included in the structure; the structure meets the following floodplain
management requirements; and a floodplain development permit has been issued
10. Critical Facilities
a. All new or substantially improved critical nonresidential facilities including, but not
limited, to governmental buildings, police stations, fire stations, hospitals, orphanages,
penal institutions, communication centers, water and sewer pumping stations, water and
sewer treatment facilities, transportation maintenance facilities, places of public
assembly, emergency aviation facilities, and schools shall be elevated above the 500-year
flood level or together with attendant utility and sanitary facilities, be floodproofed so
that below the 500-year flood level the structure is water tight with walls substantially
impermeable to the passage of water and with structural components having the
capability of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy.
A registered professional engineer or architect shall certify that the standards of this
subsection are satisfied.
Such certification shall be provided to the Floodplain
Administrator as set forth in the National Flood Insurance Program (NFIP) regulations.
b. All critical facilities shall have access routes that are above the elevation of the 500-year
flood.
c. No Critical facilities shall be constructed in any designated floodway.
SEMA Model ORD
Page 7
Updated June 2022
SECTION B. SPECIFIC STANDARDS
1. In all areas identified as numbered and unnumbered A zones and AE zones, where base flood
elevation data have been provided, as set forth in Article 4, Section A(2), the following
provisions are required:
a. Residential Construction
New construction or substantial-improvement of any residential structures, including
manufactured homes, shall have the lowest floor, including basement, elevated to two (2)
feet above base flood elevation. The elevation of the lowest floor shall be certified by a
Missouri licensed land surveyor, engineer, or architect.
Non-Residential Construction
New construction or substantial-improvement of any commercial, industrial, or other
non-residential structures, including manufactured homes, shall have the lowest floor,
including basement, elevated to two (2) feet above the base flood elevation or, together
with attendant utility and sanitary facilities, be floodproofed so that below the base flood
elevation the structure is watertight with walls substantially impermeable to the passage
of water and with structural components having the capability of resisting hydrostatic and
hydrodynamic loads and effects of buoyancy. A Missouri registered professional
engineer or architect shall certify that the standards of this subsection are satisfied. Such
certification shall be provided to the floodplain administrator as set forth in Article 3,
Section C (7), (8), (9).
C. Enclosures Below Lowest Floor
Require, for all new construction and substantial-improvements that fully enclosed areas
below lowest floor used solely for parking of vehicles, building access, or storage in an
area other than a basement and that are subject to flooding shall be designed to
automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry
and exit of flood waters. Designs for meeting this requirement must either be certified by
a registered professional engineer or architect or meet or exceed the following minimum
criteria:
(1) A minimum of two (2) openings having a total net area of not less than one (1)
square inch for every square foot of enclosed area subject to flooding shall be
provided; and
(2) The bottom of all opening shall be no higher than one (1) foot above grade.
Openings may be equipped with screens, louvers, valves, or other coverings or
devices provided that they permit the automatic entry and exit of flood waters.
SECTION C. MANUFACTURED HOMES
1. All manufactured homes to be placed within all unnumbered and numbered A zones and AE
zones, on the community's FIRM shall be required to be installed using methods and practices
SEMA Model ORD
Page 8
Updated June 2022
that minimize flood damage. For the purposes of this requirement, manufactured homes must be
elevated and anchored to resist flotation, collapse, or lateral movement. Methods of anchoring
may include, but are not limited to, use of over-the-top or frame ties to ground anchors.
2. Require manufactured homes that are placed or substantially improved within unnumbered or
numbered A zones and AE zones, on the community's FIRM on sites:
Outside of manufactured home park or subdivision;
b. In a new manufactured home park or subdivision;
c. In an expansion to and existing manufactured home park or subdivision; or
d. In an existing manufactured home park or subdivision on which a manufactured home
has incurred substantial-damage as the result of a flood, be elevated on a permanent
foundation such that the lowest floor of the manufactured home is elevated to two (2) feet
above the base flood elevation and be securely attached to an adequately anchored
foundation system to resist flotation, collapse, and lateral movement. The elevation of the
lowest floor shall be certified by a Missouri licensed land surveyor, engineer, or architect.
Require that manufactured homes to be placed or substantially improved on sites in an existing
manufactured home park or subdivision within all unnumbered and numbered A zones and AE
zones, on the community's FIRM, that are not subject to the provisions of Article 4, Section C(2)
of this ordinance, be elevated so that either:
a. the lowest floor of the manufactured home is at two (2) feet above the base flood level; or
the manufactured home chassis is supported by reinforced piers or other foundation
elements of at least equivalent strength that are no less than thirty-six (36) inches in
height above grade, and be securely attached to an adequately anchored foundation
system to resist flotation, collapse, and lateral movement.
SECTION D. FLOODWAY
Located within areas of special flood hazard established in Article 2, Section A are areas designated as
floodways. Since the floodway is an extremely hazardous area due to the velocity of flood waters that
carry debris and potential projectiles, the following provisions shall apply:
1. The community shall select and adopt a regulatory floodway based on the principle that the area
chosen for the regulatory floodway must be designed to carry the waters of the base flood
without increasing the water surface elevation of that flood more than one (1) foot at any point.
2. The community shall prohibit any encroachments, including fill, new construction, substantial-
improvements, and other development within the adopted regulatory floodway unless it has been
demonstrated through hydrologic and hydraulic analyses performed in accordance with standard
engineering practice that the proposed encroachment would not result in any increase in flood
levels within the community during the occurrence of the base flood discharge.
SEMA Model ORD
Page 9
Updated June 2022
3. A community may permit encroachments within the adopted regulatory floodway that would
result in an increase in base flood elevations, provided that the community first applies for a
conditional FIRM and Floodway revision, fulfills the requirements of such revisions as
established under the provisions of 44 CFR § 65.12, and receives the approval of FEMA.
4. If Article 4, Section D (2) is satisfied, all new construction and substantial improvements shall
comply with all applicable flood hazard reduction provisions of Article 4.
5. In unnumbered A zones, the community shall obtain, review, and reasonably utilize any base
flood elevation or floodway data currently available from Federal, State, or other sources as set
forth in Article 4, Section A (2).
SECTION E. RECREATIONAL VEHICLES
1. Require that recreational vehicles placed on sites within all unnumbered and numbered A
zones, and AE zones on the community's FIRM either:
a. Be on the site for fewer than 180 consecutive days,
b. Be fully licensed and ready for highway use*; or
c. Meet the permitting, elevation, and anchoring requirements for manufactured homes
of this ordinance.
*A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is
attached to the site only by quick-disconnect type utilities and security devices and has no
permanently attached additions.
ARTICLE 5 FLOODPLAIN MANAGEMENT VARIANCE PROCEDURES
SECTION A. ESTABLISHMENT OF APPEAL BOARD
The Board of Aldermen as established by the City of New Franklin shall hear and decide appeals and
requests for variances from the floodplain management requirements of this ordinance.
SECTION B. RESPONSIBILITY OF APPEAL BOARD
Where an application for a floodplain development permit or request for a variance from the floodplain
management regulations is denied by the floodplain administrator, the applicant may apply for such
floodplain development permit or variance directly to the appeal board, as defined in Article 5, Section
A. The appeal board shall hear and decide appeals when it is alleged that there is an error in any
requirement, decision, or determination made by the floodplain administrator in the enforcement or
administration of this ordinance.
SEMA Model ORD
Page 10
Updated June 2022
SEMA Model ORD
Page 11
Updated June 2022
SECTION C. FURTHER APPEALS
Any person aggrieved by the decision of the appeal board or any taxpayer may appeal such decision to
the Howard County Circuit Court as provided in RSMo 89.110.
SECTION D. FLOODPLAIN MANAGEMENT VARIANCE CRITERIA
In passing upon such applications for variances, the appeal board shall consider all technical data and
evaluations, all relevant factors, standards specified in other sections of this ordinance, and the following
criteria:
1. Danger to life and property due to flood damage;
2. Danger that materials may be swept onto other lands to the injury of others;
Susceptibility of the proposed facility and its contents to flood damage and the effect of such
damage on the individual owner;
4. Importance of the services provided by the proposed facility to the community;
5. Necessity to the facility of a waterfront location, where applicable;
6. Availability of alternative locations, not subject to flood damage, for the proposed use;
7. Compatibility of the proposed use with existing and anticipated development;
Relationship of the proposed use to the comprehensive plan and floodplain management program
for that area;
9. Safety of access to the property in times of flood for ordinary and emergency vehicles;
10. Expected heights, velocity, duration, rate of rise and sediment transport of the flood waters, if
applicable, expected at the site; and,
11. Costs of providing governmental services during and after flood conditions, including
maintenance and repair of public utilities and facilities such as sewer, gas, electrical, and water
systems; streets; and bridges.
SECTION E. CONDITIONS FOR APPROVING FLOODPLAIN MANAGEMENT VARIANCES
1. Generally, variances may be issued for new construction and substantial improvements to be
erected on a lot of one-half acre or less in size contiguous to and surrounded by lots with existing
structures constructed below the base flood level, providing items 2 through 6 below have been
fully considered. As the lot size increases beyond the one-half acre, the technical justification
required for issuing the variance increases.
SEMA Model ORD
Page 12
Updated June 2022
Variances may be issued for the repair or rehabilitation of structures listed on the National
Register of Historic Places, the State Inventory of Historic Places, or local inventory of historic
places upon determination provided the proposed activity will not preclude the structure's
continued historic designation and the variance is the minimum necessary to preserve the historic
character and design of the structure.
3. Variances shall not be issued within any designated floodway if any increase in flood levels
during the base flood discharge would result.
4. Variances shall only be issued upon a determination that the variance is the minimum necessary,
considering the flood hazard, to afford relief.
5. Variances shall only be issued upon: (a) a showing of good and sufficient cause, (b) a
determination that failure to grant the variance would result in exceptional hardship to the
applicant, and (c) a determination that the granting of a variance will not result in increased flood
heights, additional threats to public safety, extraordinary public expense, create nuisances, cause
fraud on or victimization of the public, or conflict with existing local laws or ordinances.
6. A community shall notify the applicant in writing over the signature of a community official that
(a) the issuance of a variance to construct a structure below base flood level will result in
increased premium rates for flood insurance up to amounts as high as $25.00 for $100.00 of
insurance coverage and (b) such construction below the base flood level increases risks to life
and property. Such notification shall be maintained with the record of all variance actions as
required by this ordinance.
7. A community shall maintain a record of all variance actions, including justification for their
issuance.
8. Variances may be issued by a community for new construction and substantial improvements
and for other development necessary for the conduct of a functionally dependent use provided
that the criteria of items 1 through 5 of this section are met, and the structure or other
development is protected by methods that minimize flood damages during the base flood and
create no additional threats to public safety.
SECTION F: CONDITIONS FOR APPROVING VARIANCES OF ACCESSORY STRUCTURES
Any permit granted for an accessory structure shall be decided individually based on a case-by-case
analysis of the building's unique circumstances. Permits shall meet the following conditions.
In order to minimize flood damages during the one percent annual chance flood event, also referred to as
the 100-year flood and the threat to public health and safety, the following conditions shall be required
for any permit issued for accessory structures that are constructed at-grade and wet-floodproofed:
a. Use of the accessory structures must be solely for parking and limited storage purposes in any
special flood hazard area as identified on the community's Flood Insurance Rate Map (FIRM).
b. For any new or substantially damaged accessory structures, the exterior and interior building
components and elements (i.e., foundation, wall framing, exterior and interior finishes, flooring,
etc.) below the base flood elevation, must be built with flood-resistant materials in accordance
with Article 4, Section A (4)(b) of this ordinance.
SEMA Model ORD
Page 13
Updated June 2022
c. The accessory structures must be adequately anchored to prevent flotation, collapse, or lateral
movement of the structure in accordance with Article 4, Section A (4)(a) of this ordinance. All of
the building's structural components must be capable of resisting specific flood-related forces
including hydrostatic, buoyancy, and hydrodynamic and debris impact forces.
d. Any mechanical, electrical, or other utility equipment must be located 2 feet above the base flood
elevation or floodproofed so that they are contained within a watertight, floodproofed enclosure
that is capable of resisting damage during flood conditions in accordance with Article 4, Section
A (4)(d) of this ordinance.
e. The accessory structures must meet all NFIP opening requirements. The NFIP requires that
enclosure or foundation walls, subject to the one percent annual chance flood event, also referred
to as the 100-year flood, contain openings that will permit the automatic entry and exit of flood
waters in accordance with Article 4, Section B (1)(c) of this ordinance.
f. The accessory structures must comply with the floodplain management floodway encroachment
provisions of Article 4, Section D (2) of this ordinance. No permits may be issued for accessory
structures within any designated floodway, if any increase in flood levels would result during the
100-year flood.
g. Equipment, machinery, or other contents must be protected from any flood damage.
h. No disaster relief assistance under any program administered by any Federal agency shall be paid
for any repair or restoration costs of the accessory structures.
i. Wet-floodproofing construction techniques must be reviewed and approved by the community.
The community may request approval by a registered professional engineer or architect prior to
the issuance of any floodplain development permit for construction. Cost for any required
professional certification to be paid by the developer.
SECTION G: CONDITIONS FOR APPROVING VARIANCES OF AGRICULTURAL
STRUCTURES
Any permit granted for an agricultural structure shall be decided individually based on a case-by-case
analysis of the building's unique circumstances.
In order to minimize flood damages during the 100-year flood and the threat to public health and safety,
the following conditions shall be included for any permit issued for agricultural structures that are
constructed at-grade and wet-floodproofed:
a. All proposed agricultural structures shall demonstrate that no other alternate location outside of
the special flood hazard area exists for the agricultural structure. Residential structures, such as
farm houses, cannot be considered agricultural structures.
Use of the structures must be limited to agricultural purposes in any special flood hazard area
only as identified on the community's Flood Insurance Rate Map (FIRM).
SEMA Model ORD
Page 14
Updated June 2022
C. For any new or substantially damaged agricultural structures, the exterior and interior building
components and elements (i.e., foundation, wall framing, exterior and interior finishes, flooring,
etc.) below the base flood elevation, must be built with flood-resistant materials in accordance
with Article 4, Section A (4)(b) of this ordinance.
d. The agricultural structures must be adequately anchored to prevent flotation, collapse, or lateral
movement of the structures in accordance with Article 4, Section A (4)(a) of this ordinance. All
of the building's structural components must be capable of resisting specific flood-related forces
including hydrostatic, buoyancy, and hydrodynamic and debris impact forces.
e. Any mechanical, electrical, or other utility equipment must be located 2 feet above the base flood
elevation or floodproofed so that they are contained within a watertight, floodproofed enclosure
that is capable of resisting damage during flood conditions in accordance with Article 4, Section
A (4)(d) of this ordinance. The elevation shall be certified by a licensed land surveyor or
professional engineer.
f. The agricultural structures must meet all National Flood Insurance Program (NFIP) opening
requirements. The NFIP requires that enclosure or foundation walls, subject to the one percent
annual chance flood event, also referred to as the 100-year flood, contain openings that will
permit the automatic entry and exit of flood waters in accordance with Article 4, Section B (1)(c)
of this ordinance.
8. The agricultural
structures must comply with the floodplain management floodway
encroachment provisions of Article 4, Section D (2) of this ordinance. No permits may be issued
for agricultural structures within any designated floodway, if any increase in flood levels would
result during the one percent annual chance flood event, also referred to as the 100-year flood.
h. Major equipment, machinery, or other contents must be protected from any flood damage.
i. No disaster relief assistance under any program administered by any Federal agency shall be paid
for any repair or restoration costs of the agricultural structures.
j. Wet-floodproofing construction techniques must be reviewed and approved by the community.
The community may request approval by a registered professional engineer or architect prior to
the issuance of any floodplain development permit for construction. Cost for any required
professional certification to be paid by the developer.
ARTICLE 6 PENALTIES FOR VIOLATION
1. Violation of the provisions of this ordinance or failure to comply with any of its requirements
(including violations of conditions and safeguards established in connection with granting of
variances) shall constitute a misdemeanor. Any person, firm, corporation, or other entity that
violates this ordinance or fails to comply with any of its requirements shall, upon conviction
thereof, be fined not more than $ 500.00, and in addition, shall pay all costs and expenses
involved in the case. Each day such violation continues shall be considered a separate offense.
SEMA Model ORD
Page 15
Updated June 2022
3. A structure or other development without a floodplain development permit or other evidence of
compliance is presumed to be in violation until such documentation is provided.
The imposition of such fines or penalties for any violation for non-compliance with this
ordinance shall not excuse the violation or noncompliance or allow it to continue. All such
violations or noncompliant actions shall be remedied within an established and reasonable time.
Nothing herein contained shall prevent the City of New Franklin or other appropriate authority
from taking such other lawful action as is necessary to prevent or remedy any violation.
ARTICLE 7 AMENDMENTS
The regulations, restrictions, and boundaries set forth in this ordinance may from time to time be
amended, supplemented, changed, or appealed to reflect any and all changes in the National Flood
Disaster Protection Act of 1973, provided, however, that no such action may be taken until after a public
hearing in relation thereto, at which parties of interest and citizens shall have an opportunity to be heard.
Notice of the time and place of such hearing shall be published in a newspaper of general circulation in
the City of New Franklin. At least twenty (20) days shall elapse between the date of this publication and
the public hearing. A copy of such amendments will be provided to the Region VII office of the Federal
Emergency Management Agency (FEMA). The regulations of this ordinance are in compliance with the
National Flood Insurance Program (NFIP) regulations.
SEMA Model ORD
Page 16
Updated June 2022
ARTICLE 8 DEFINITIONS
Unless specifically defined below, words or phrases used in this ordinance shall be interpreted so as to
give them the same meaning they have in common usage and to give this ordinance its most reasonable
application.
"100-year Flood" see "base flood."
"Accessory Structure" means the same as "appurtenant structure."
"Actuarial Rates" see "risk premium rates."
"Administrator" means the Federal Insurance Administrator.
"Agency" means the Federal Emergency Management Agency (FEMA).
"Agricultural Commodities" means agricultural products and livestock.
"Agricultural Structure" means any structure used exclusively in connection with the production,
harvesting, storage, drying, or raising of agricultural commodities.
"Appeal" means a request for review of the floodplain administrator's interpretation of any provision of
this ordinance or a request for a variance.
"Appurtenant Structure" means a structure that is on the same parcel of property as the principle
structure to be insured and the use of which is incidental to the use of the principal structure.
"Area of Special Flood Hazard" is the land in the floodplain within a community subject to a one
percent or greater chance of flooding in any given year.
"Base Flood" means the flood having a one percent chance of being equaled or exceeded in any given
year.
"Base Flood Elevation" means the elevation of the surface of the water during a one percent annual
chance flood event.
"Basement" means any area of the structure having its floor subgrade (below ground level) on all sides.
"Building" see "structure."
"Chief Executive Officer" or "Chief Elected Official" means the official of the community who is
charged with the authority to implement and administer laws, ordinances, and regulations for that
community.
"Community" means any State or area or political subdivision thereof, which has authority to adopt
and enforce floodplain management regulations for the areas within its jurisdiction.
SEMA Model ORD
Page 17
Updated June 2022
"Development" means any man-made change to improved or unimproved real estate, including but not
limited to buildings or other structures, levees, levee systems, mining, dredging, filling, grading, paving,
excavation or drilling operations, or storage of equipment or materials.
"Elevated Building" means for insurance purposes, a non-basement building which has its lowest
elevated floor raised above ground level by foundation walls, shear walls, posts, piers, pilings, or
columns.
"Eligible Community" or "Participating Community" means a community for which the
Administrator has authorized the sale of flood insurance under the National Flood Insurance Program
(NFIP).
"Existing Construction" means for the purposes of determining rates, structures for which the "start of
construction" commenced before the effective date of the FIRM or before January 1, 1975, for FIRMs
effective before that date. "Existing construction" may also be referred to as "existing structures."
"Existing Manufactured Home Park or Subdivision" means a manufactured home park or
subdivision for which the construction of facilities for servicing the lots on which the manufactured
homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets,
and either final site grading or the pouring of concrete pads) is completed before the effective date of the
floodplain management regulations adopted by a community.
"Expansion to an Existing Manufactured Home Park or Subdivision" means the preparation of
additional sites by the construction of facilities for servicing the lots on which the manufactured homes
are to be affixed (including the installation of utilities, the construction of streets, and either final site
grading or the pouring of concrete pads).
"Flood" or "Flooding" means a general and temporary condition of partial or complete inundation of
normally dry land areas from: (1) the overflow of inland waters; (2) the unusual and rapid accumulation
or runoff of surface waters from any source; and (3) the collapse or subsidence of land along the shore
of a lake or other body of water as a result of erosion or undermining caused by waves or currents of
water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a
natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as
flash flood, or by some similarly unusual and unforeseeable event which results in flooding as defined
above in item (1).
"Flood Boundary and Floodway Map (FBFM)" means an official map of a community on which the
Administrator has delineated both special flood hazard areas and the designated regulatory floodway.
"Flood Hazard Map" means the document adopted by the governing body showing the limits of: (1)
the floodplain; (2) the floodway; (3) streets; (4) stream channel; and (5) other geographic features.
"Flood Elevation Determination" means a determination by the Administrator of the water surface
elevations of the base flood, that is, the flood level that has a one percent or greater chance of occurrence
in any given year.
SEMA Model ORD
Page 18
Updated June 2022
"Flood Elevation Study" means an examination, evaluation and determination of flood hazards.
"Flood Fringe" means the area outside the floodway encroachment lines, but still subject to inundation
by the regulatory flood.
"Flood Hazard Boundary Map (FHBM)" means an official map of a community, issued by the
Administrator, where the boundaries of the flood areas having special flood hazards have been
designated as (unnumbered or numbered) A zones.
"Flood Insurance Rate Map (FIRM)" means an official map of a community, on which the
Administrator has delineated both the special flood hazard areas and the risk premium zones applicable
to the community.
"Flood Insurance Study (FIS)" means an examination, evaluation and determination of flood hazards
and, if appropriate, corresponding water surface elevations.
"Floodplain" or "Flood-prone Area" means any land area susceptible to being inundated by water
from any source (see "flooding").
"Floodplain Management" means the operation of an overall program of corrective and preventive
measures for reducing flood damage, including but not limited to emergency preparedness plans, flood
control works, and floodplain management regulations.
"Floodplain Management Regulations" means zoning ordinances, subdivision regulations, building
codes, health regulations, special purpose ordinances (such as floodplain and grading ordinances) and
other applications of police power. The term describes such state or local regulations, in any
combination thereof that provide standards for the purpose of flood damage prevention and reduction.
"Floodproofing" means any combination of structural and nonstructural additions, changes, or
adjustments to structures that reduce or eliminate flood damage to real estate or improved real property,
water and sanitary facilities, or structures and their contents.
"Floodway" or "Regulatory Floodway" means the channel of a river or other watercourse and the
adjacent land areas that must be reserved in order to discharge the base flood without cumulatively
increasing the water surface elevation more than one foot.
"Floodway Encroachment Lines" means the lines marking the limits of floodways on Federal, State
and local floodplain maps.
"Freeboard" means a factor of safety usually expressed in feet above a flood level for purposes of
floodplain management. "Freeboard" tends to compensate for the many unknown factors that could
contribute to flood heights greater than the height calculated for a selected size flood and floodway
conditions, such as bridge openings and the hydrological effect of urbanization of the watershed.
SEMA Model ORD
Page 19
Updated June 2022
"Functionally Dependent Use" means a use that cannot perform its intended purpose unless it is
located or carried out in close proximity to water. This term includes only docking facilities and
facilities that are necessary for the loading and unloading of cargo or passengers, but does not include
long-term storage or related manufacturing facilities.
"Highest Adjacent Grade" means the highest natural elevation of the ground surface prior to
construction next to the proposed walls of a structure.
"Historic Structure" means any structure that is (a) listed individually in the National Register of
Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the
Secretary of the Interior as meeting the requirements for individual listing on the National Register; (b)
certified or preliminarily determined by the Secretary of the Interior as contributing to the historical
significance of a registered historic district or a district preliminarily determined by the Secretary to
qualify as a registered historic district; (c) individually listed on a state inventory of historic places in
states with historic preservation programs which have been approved by the Secretary of the Interior; or
(d) individually listed on a local inventory of historic places in communities with historic preservation
programs that have been certified either (1) by an approved state program as determined by the
Secretary of the Interior or (2) directly by the Secretary of the Interior in states without approved
programs.
"Lowest Floor" means the lowest floor of the lowest enclosed area, including basement. An unfinished
or flood-resistant enclosure, usable solely for parking of vehicles, building access, or storage, in an area
other than a basement area, is not considered a building's lowest floor, provided that such enclosure is
not built so as to render the structure in violation of the applicable floodproofing design requirements of
this ordinance.
"Manufactured Home" means a structure, transportable in one or more sections, that is built on a
permanent chassis and is designed for use with or without a permanent foundation when attached to the
required utilities. The term "manufactured home" does not include a "recreational vehicle."
"Manufactured Home Park or Subdivision" means a parcel (or contiguous parcels) of land divided
into two or more manufactured home lots for rent or sale.
"Map" means the Flood Hazard Boundary Map (FHBM), Flood Insurance Rate Map (FIRM), or the
Flood Boundary and Floodway Map (FBFM) for a community issued by the Federal Emergency
Management Agency (FEMA).
"Market Value" or "Fair Market Value" means an estimate of what is fair, economic, just and
equitable value under normal local market conditions.
"Mean Sea Level" means, for purposes of the National Flood Insurance Program (NFIP), the National
Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on a
community's Flood Insurance Rate Map (FIRM) are referenced.
"New Construction" means, for the purposes of determining insurance rates, structures for which the
"start of construction" commenced on or after the effective date of an initial FIRM or after December
SEMA Model ORD
Page 20
Updated June 2022
31, 1974, whichever is later, and includes any subsequent improvements to such structures. For
floodplain management purposes, "new construction" means structures for which the "start of
construction" commenced on or after the effective date of the floodplain management regulations
adopted by a community and includes any subsequent improvements to such structures.
"New Manufactured Home Park or Subdivision" means a manufactured home park or subdivision
for which the construction of facilities for servicing the lot on which the manufactured homes are to be
affixed (including at a minimum, the installation of utilities, the construction of streets, and either final
site grading or the pouring of concrete pads) is completed on or after the effective date of floodplain
management regulations adopted by the community.
"(NFIP)" means the National Flood Insurance Program (NFIP).
"Numbered A Zone" means a special flood hazard area where the Flood Insurance Rate Map shows the
Base Flood Elevation.
"One Percent Annual Chance Flood" see "base flood."
"Participating Community" also known as an "eligible community, " means a community in which the
Administrator has authorized the sale of flood insurance.
"Person" includes any individual or group of individuals, corporation, partnership, association, or any
other entity, including Federal, State, and local governments and agencies.
"Permit" means a signed document from a designated community official authorizing development in a
floodplain, including all necessary supporting documentation such as: (1) the site plan; (2) an elevation
certificate; and (3) any other necessary or applicable approvals or authorizations from local, state or
federal authorities.
"Principally Above Ground" means that at least 51 percent of the actual cash value of the structure,
less land value, is above ground.
"Reasonably Safe From Flooding" means base flood waters will not inundate the land or damage
structures to be removed from the SHA and that any subsurface waters related to the base flood will
not damage existing or proposed buildings.
"Recreational Vehicle" means a vehicle which is (a) built on a single chassis; (b) 400 square feet or
less when measured at the largest horizontal projections; (c) designed to be self-propelled or
permanently towable by a light- duty truck; and (d) designed primarily not for use as a permanent
dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
"Remedy A Violation" means to bring the structure or other development into compliance with
Federal, State, or local floodplain management regulations; or, if this is not possible, to reduce the
impacts of its noncompliance.
"Repetitive Loss" means flood-related damages sustained by a structure on two separate occasions
SEMA Model ORD
Page 21
Updated June 2022
during a 10-year period for which the cost of repairs at the time of each such flood event, equals or
exceeds twenty-five percent of the market value of the structure before the damage occurred.
"Risk Premium Rates" means those rates established by the Administrator pursuant to individual
community studies and investigations which are undertaken to provide flood insurance in accordance
with Section 1307 of the National Flood Disaster Protection Act of 1973 and the accepted actuarial
principles. "Risk premium rates" include provisions for operating costs and allowances.
"Special Flood Hazard Area" see "area of special flood hazard."
"Special Hazard Area" means an area having special flood hazards and shown on an FHBM, FIRM or
FBFM as zones (unnumbered or numbered) A and AE.
"Start of Construction" includes substantial-improvements, and means the date the building permit
was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition
placement, or other improvements were within 180 days of the permit date. The actual start means
either the first placement of permanent construction of a structure on a site, such as the pouring of slabs
or footings, the installation of piles, the construction of columns, any work beyond the stage of
excavation, or the placement of a manufactured home on a foundation. Permanent construction does not
include land preparation, such as clearing, grading and filling, the installation of streets and/or
walkways, excavation for a basement, footings, piers, foundations, the erection of temporary forms, nor
installation on the property of accessory structures, such as garages or sheds not occupied as dwelling
units or not part of the main structure. For a substantial improvement, the actual start of construction
means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not
that alteration affects the external dimensions of the building.
"State Coordinating Agency" means that agency of the state government, or other office designated by
the governor of the state or by state statute at the request of the Administrator to assist in the
implementation of the National Flood Insurance Program (NFIP) in that state.
"Structure" means, for floodplain management purposes, a walled and roofed building, including a gas
or liquid storage tank, that is principally above ground, as well as a manufactured home. "Structure" for
insurance purposes, means a walled and roofed building, other than a gas or liquid storage tank that is
principally above ground and affixed to a permanent site, as well as a manufactured home on a
permanent foundation. For the latter purpose, the term includes a building while in the course of
construction, alteration or repair, but does not include building materials or supplies intended for use in
such construction, alteration or repair, unless such materials or supplies are within an enclosed building
on the premises.
"Substantial-Damage" means damage of any origin sustained by a structure whereby the cost of
restoring the structure to its before damaged condition would equal or exceed 50 percent of the market
value of the structure before the damage occurred. The term includes Repetitive Loss buildings (see
definition).
For the purposes of this definition, "repair" is considered to occur when the first repair or reconstruction
of any wall, ceiling, floor, or other structural part of the building commences.
SEMA Model ORD
Page 22
Updated June 2022
The term does not apply to:
a.) Any project for improvement of a building required to comply with existing health, sanitary, or
safety code specifications which have been identified by the Code Enforcement Official and
which are solely necessary to assure safe living conditions, or
b.) Any alteration of a "historic structure" provided that the alteration will not preclude the
structure's continued designation as a "historic structure.
"Substantial Improvement" means any combination of reconstruction, alteration, or improvement to a
building, taking place for a 10-year period, in which the cumulative percentage of improvement equals
or exceeds fifty percent of the current market value of the building. For the purposes of this definition,
an improvement occurs when the first alteration of any wall, ceiling, floor, or other structural part of the
building commences, whether or not that alteration affects the external dimensions of the building. This
term includes structures, which have incurred "repetitive loss" or "substantial damage", regardless of the
actual repair work done.
The term does not apply to:
a.) Any project for improvement of a building required to comply with existing health, sanitary, or
safety code specifications which have been identified by the Code Enforcement Official and
which are solely necessary to assure safe living conditions, or
b.) Any alteration of a "historic structure" provided that the alteration will not preclude the
structure's continued designation as a "historic structure."
"Substantially Improved Existing Manufactured Home Parks Or Subdivisions" is where the repair,
reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50
percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement
commenced.
"Unnumbered A Zone" means a special flood hazard area shown on either a flood hazard boundary
map or flood insurance rate map where the base flood elevation is not determined.
"Variance" means a grant of relief by the community from the terms of a floodplain management
regulation. Flood insurance requirements remain in place for any varied use or structure and cannot be
varied by the community.
"Violation" means the failure of a structure or other development to be fully compliant with the
community's floodplain management regulations. A structure or other development without the
elevation certificate, other certifications, or other evidence of compliance required by this ordinance is
presumed to be in violation until such time as that documentation is provided.
SEMA Model ORD
Page 23
Updated June 2022
"Water Surface Elevation" means the height, in relation to the National Geodetic Vertical Datum
(NGVD) of 1929 (or other datum where specified) of floods of various magnitudes and frequencies in
the floodplain.
SEMA Model ORD
Page 24
Updated June 2022
ARTICLE 9 CERTIFICATE OF ADOPTION
This Floodplain Management Ordinance for the community of New Franklin, Missouri.
ADOPTED AND APPROVED by the Governing Body of New Franklin, Missouri.
This 14th
of november
2027
Year
Place seal here.
poll fars
Playor
Chief Executive Officer/Chief Elected Official (Signature)
Robbey Harvey
Name
Title
Mayor
Chief Executive Officer/Chief Elected Official (Typed/printed)
ATTEST:
Melissa Growley
Signature of Recording Clerk
Melissa Crowba City Clark.
Recording Clerk (Typed/printed)
SEMA Model ORD
Page 25
Updated June 2022
Official source: Ordinance 805 (PDF on the city site)
Last checked October 30, 2026. The city's official copy controls; this page is a reading copy, not legal advice.