New Franklin Construction of Improvements ordinance (§ 410.060)
Chapter 410: Subdivision Regulations
A. All sanitary sewers and appurtenances in this Section being developed shall be constructed according to the standards and specifications of the Missouri Clean Water Commission.
B. Utility services shall be installed under the proposed streets prior to paving where subsurface conditions prevent pushing of services under the completed pavement. Sewer laterals shall also be stubbed in prior to street paving if the sewer main is located on street right-of-way. All such service connections shall be extended at least two (2) feet beyond the edge of pavement and shall be adequately referenced and marked for future use. All such services shall be installed in accordance with applicable codes and ordinances.
C. Upon the completion of street paving, the contractor shall request in writing acceptance of the street by the City for maintenance. The City will not accept streets for maintenance until the pavement has been inspected and until all provisions of this Title have been met.
D. Monuments as described in Section 410.010 shall be installed and adequately referenced to facilitate future replacement. Control point monument locations shall be verified and/or re-established after street paving has been completed and prior to acceptance of the street for maintenance by the City.
E. The developer shall be held responsible for any and all defective workmanship for a period of one (1) year from the date of the acceptance of the improvements described therein.
Official source: New Franklin City Code, page 68 of the city's PDF
Last checked October 30, 2026. The city's official copy controls; this page is a reading copy, not legal advice.