Kingdom City Conditions for Approving Floodplain Management Variances ordinance (§ 405.250)

Chapter 405: Floodplain Management · Article V. Floodplain Management Variance Procedures

A. Generally, variances may be issued for new construction and substantial improvements to be erected on a lot of one-half (1/2) acre or less in size contiguous to and surrounded by lots with existing structures constructed below the base flood level, providing items in Subsection (A)(1) through (5) below have been fully considered. As the lot size increases beyond the one-half (1/2) acre, the technical justification required for issuing the variance increases.

1. Variances may be issued for the reconstruction, rehabilitation, or restoration of structures listed on the National Register of Historic Places, the State Inventory of Historic Places, or local inventory of historic places only upon a determination that the proposed activity will not preclude the structure's continued historic designation.

2. Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.

3. Variances shall only be issued upon a determination that the variance is the minimum necessary considering the flood hazard to afford relief.

4. Variances shall only be issued upon:

a. A showing by the applicant of good and sufficient cause;

b. A determination by the Board that failure to grant the variance would result in exceptional hardship to the applicant, and

c. A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud or victimization of the public, or conflict with existing local laws or ordinances.

5. As part of the variance process, the Board shall notify the applicant in writing over the signature of a Village official that: (1) the issuance of a variance to construct a structure below base flood level will result in increased premium rates for flood insurance up to amounts as high as twenty-five dollars ($25.00) for one hundred dollars ($100.00) of insurance coverage; and (2) such construction below the base flood level increases risks to life and property. A copy of such notification shall be maintained with the record of all variance actions as required for this Chapter.

Official source: Village of Kingdom City official Code of Ordinances (online), § 405.250