Hallsville Drainage Requirements ordinance (§ 515.040)
Chapter 515: Streets, Sidewalks and Other Public Places · Article II. Street Construction Standards
All streets shall drain to stormwater facilities designed to handle expected flows produced be a storm projected to occur on an average of once every five (5) years. Gutter flows shall be discharged to stormwater inlets conforming to standards attached hereto and made a part of this Article. Storm drainage channels shall be stabilized sufficiently to deter erosion and/or deterioration of the channel. Silt fencing is required during all phases of the construction/development stages of the project. All methods shall be those in compliance with local and State requirements. No stormwater (allowed entry in any way, shape or form) shall be allowed entry into the City Sanitary Sewage System.
Official source: City of Hallsville official Code of Ordinances (online), § 515.040
Last checked November 1, 2026. The city's official copy controls; this page is a reading copy, not legal advice.