Wassail Walk Friday, Nov. 27 · 27 days 20 hrs See the route →
Skip to content

← Boonville ordinances

Boonville Repair, replacement and/or disposal of broken, defective or decommissioned systems ordinance (Appendix C, Section 16.7)

Appendix C: Zoning · Part 16. Solar Photovoltaic Systems

Prior to the issuance of the building permit for a S/P or PV system, the owner or installer shall provide a statement that the solar panels contain no hazardous materials and all materials can be handled as other building materials through the city's transfer station when the time comes for replacement or disposal. If there are hazardous materials in the system or the system has special handling requirements that will need to be followed in the event of an emergency or disposal, a plan must be approved and recorded with the city as in the commercial applications section below. In the event a system is abandoned, not maintained or otherwise becomes a nuisance, the city shall prosecute and abate the nuisance pursuant to the nuisance codes under chapter 13, sections 2 and 4.

Official source: City of Boonville official Code of Ordinances (online): look up Sec. 16.7

Text from Supplement 8 (December 2025), through Ordinance 4678 of December 16, 2024.

Last checked October 30, 2026. The city's official copy controls; this page is a reading copy, not legal advice.